
Services
Project Estimation & Proposals
The number is only as good as the scope behind it
Most estimating problems aren't math problems. They're scope problems: a drawing that doesn't match a spec, a tie-in nobody priced, an exclusion the other side never read. We work the package the way a reviewer would — checking what's actually being asked for, then pricing it — so you submit with a clear picture of your risk.
- ■Electrical work and capital projects are our focus
- ■Independent set of eyes before the number goes out
- ■Written inclusions, exclusions and assumptions

Electrical work
Estimating electrical packages properly
Electrical scope is easy to under-count. Here's what we work through with you.
Takeoffs that match the drawings
Conduit, cable, boxes, devices, fixtures, panels and switchgear counted off the drawings and specs — not from a rule of thumb — so nothing gets priced twice and nothing gets missed.
Labour hours you can defend
Hours set by assembly type and crew composition, with overtime, lift, access and mobilization time called out so the number stands up in a bid review.
Material and lead-time risk
Switchgear, transformers, breakers and specialty gear priced with realistic lead times, so a 30-week delivery doesn't land on your schedule after award.
Scope and code checks
Temporary power, tie-ins, outage windows, arc flash work and code requirements flagged before you price them, with the clarifications written out for you.
The proposal write-up
Inclusions, exclusions, assumptions, alternates and clarifications written so what you priced and what you're on the hook for are the same thing.
Capital projects
Budgets and proposals for capital work
Whether you're the owner building the appropriation package or the contractor bidding into one, capital projects need a cost story that holds up in a review.
Estimates at the right stage
Order-of-magnitude numbers early, then tighter definite estimates as the design matures, so your appropriation package isn't built on a guess.
Contingency and escalation
Contingency sized to the design stage and escalation carried to the mid-point of construction, instead of a flat percentage dropped in at the end.
Business case and appropriation
Cost, benefit, phasing and risk assembled into a package your board or capital committee can actually review and approve.
Phasing and outage planning
Work split into phases with outage windows, temporary services and swing space costed — these are the items capital budgets most often miss.
Comparing what comes back
Bids and proposals leveled side by side so scope gaps, exclusions and alternates are visible before you award.
How it works
Send the package
Drawings, specs, the RFP or the scope you're working from — whatever exists today.
We estimate it
Takeoffs, labour, material and the risks that actually move the number.
We write it up
A proposal or estimate summary that shows what's in, what's out and what's assumed.
We walk you through it
We go over the number with your team before it goes out the door.
Want to see how technology and AI can speed up your estimating and proposal work? That's a separate service we offer.
Technology & AI Strategy →Get an estimate or proposal reviewed
Tell us about your project and we'll get back to you.
Email info@build-ready.ca